h1
h1

Apr 20

Fireplace Update 3 – Cement board complete

Finally at last I have the concrete board complete and all screwed in place. Have to say that the board sure does a number on utility blades. Everything is now in place to start on the rock work which is going to be the most time consuming part so I will keep you all  posted at different intervals on that. Hopefully I will be able to dedicate some good time towards it and not be delayed by the rain and cold here.

No comments »
h1
h1

No Comments

Leave a comment

:alien: :angel: :angry: :blink: :blush: :cheerful: :cool: :cwy: :devil: :dizzy: :ermm: :face: :getlost: :biggrin: :happy: :heart: :kissing: :lol: :ninja: :pinch: :pouty: :sad: :shocked: :sick: :sideways: :silly: :sleeping: :smile: :tongue: :unsure: :w00t: :wassat: :whistle: :wink: :wub:

h1
h1